top of page
True Love Carpentry
RIDGE STREET BATHROOM REMODEL
This bathroom remodel included both structural and cosmetic work. Failing wetbed tile walls and floors were removed and replaced with concrete board. Joists were repaired and a new subfloor installed. Crack isolation membrane was installed prior to setting porcelain floor tiles. A window located within the shower was reframed and replaced with added waterproofing strategies. A hollow-core door was reframed and replaced with a new solid core door.
White subway tile was set for the tub surround and wainscoting. A new tub, basin, and vanity were installed. Damaged portions of walls were repaired and seamless married to existing walls using wallboard, structolite, and plaster of paris.
bottom of page